arXiv:2409.08721 공식 코드 · Papers with Code

Optimal Operation of a Building with Electricity-Heat Networks and Seasonal Storage

Eléa Prat, Pierre Pinson, Richard M. Lusby, Riwal Plougonven, Jordi Badosa, Philippe Drobinski

제출 2024-09-13

원문 초록

As seasonal thermal energy storage emerges as an efficient solution to reduce CO2 emissions of buildings, challenges appear related to its optimal operation. In a system including short-term electricity storage, long-term heat storage, and where electricity and heat networks are connected through a heat pump, it becomes crucial to operate the system on two time scales. Based on real data from a university building, we simulate the operation of such a system over a year, comparing different strategies based on model predictive control (MPC). The first objective of this paper is to determine the minimum prediction horizon to retrieve the results of the full-horizon operation problem with cost minimization. The second objective is to evaluate a method that combines MPC with setting targets on the heat storage level at the end of the prediction horizon, based on historical data. For a prediction horizon of 6 days, the suboptimality gap with the full-horizon results is 4.31%, compared to 11.42% when using a prediction horizon of 42 days and fixing the final level to be equal to the initial level, which is a common approach.

함께 살펴볼 논문

공통 태그를 근거로 연결했습니다. 실제 인용 관계나 논문의 우수성을 뜻하지 않습니다.

토론

이 논문과 연결된 포럼 글이 아직 없습니다.