arXiv:2610.23917v3 cs.LG

Announced Breaks Separate Conformal Reliability from Frequency Calibration

Karl Li

제출 2026-11-17

원문 초록

When the process behind a time series changes on an announced date, like Australia's switch to five minute electricity settlement on October 1, 2021, intervals calibrated before it can stop covering at their stated level. Whether a forecaster needs the next interval to cover or a finished period's share of misses on target decides the restart. We recompute the next conformal interval from post-break forecast errors, and for n independent ones from the same continuous law, its expected coverage error is $O(n^{-1/2})$, the optimal order in a fixed class among methods told the date. For a finished period's share of misses to match its target, we restart adaptive conformal inference (ACI), which on bounded errors brings that share within $O(n^{-1})$ of target if its corrections at a lower limit stay bounded in total, for that period only. After a simulated mean jump of 5.0 standard deviations, recomputed 90% intervals lie an expected 3.5 percentage points from target at the 50th forecast, a third closer than the 5.2 of the best of five adaptive methods. Of 9 announced changes in Texas, Australian and PJM power markets and a Federal Reserve decision, only Australia's switch moves the errors enough for a 5% test at 80% power to resolve a gain from restarting ACI, and dates help restarted ACI only after large changes.

제출 이력

확인된 버전만 표시합니다. 전체 제출 이력은 arXiv 원문에서 확인하세요.

  1. arXiv:2610.23917v3제출 시각 미확인

함께 살펴볼 논문

공통 태그를 근거로 연결했습니다. 실제 인용 관계나 논문의 우수성을 뜻하지 않습니다.

공통 태그로 연결된 공개 논문이 아직 없습니다.

토론

이 논문과 연결된 포럼 글이 아직 없습니다.