arXiv:2403.01277

Optimal Integrated Task and Path Planning and Its Application to Multi-Robot Pickup and Delivery

Aman Aryan, Manan Modi, Indranil Saha, Rupak Majumdar, Swarup Mohalik

제출 2024-03-02

원문 초록

We propose a generic multi-robot planning mechanism that combines an optimal task planner and an optimal path planner to provide a scalable solution for complex multi-robot planning problems. The Integrated planner, through the interaction of the task planner and the path planner, produces optimal collision-free trajectories for the robots. We illustrate our general algorithm on an object pick-and-drop planning problem in a warehouse scenario where a group of robots is entrusted with moving objects from one location to another in the workspace. We solve the task planning problem by reducing it into an SMT-solving problem and employing the highly advanced SMT solver Z3 to solve it. To generate collision-free movement of the robots, we extend the state-of-the-art algorithm Conflict Based Search with Precedence Constraints with several domain-specific constraints. We evaluate our integrated task and path planner extensively on various instances of the object pick-and-drop planning problem and compare its performance with a state-of-the-art multi-robot classical planner. Experimental results demonstrate that our planning mechanism can deal with complex planning problems and outperforms a state-of-the-art classical planner both in terms of computation time and the quality of the generated plan.

함께 살펴볼 논문

공통 태그를 근거로 연결했습니다. 실제 인용 관계나 논문의 우수성을 뜻하지 않습니다.

토론

이 논문과 연결된 포럼 글이 아직 없습니다.