Stress-informed Control of Medium- and High-head Hydropower Plants to Reduce Penstock Fatigue
원문 초록
The displacement of conventional generation in favor of stochastic renewable requires increasing regulation duties from the remaining dispatchable resources. In high- and medium-head hydropower plants (HPPs), providing regulation services to the grid and frequently changing the plant's set-point causes water hammer, which engenders pressure and stress transients within the pressurized conduits, especially the penstock, damaging it in the long run. This paper proposes a model predictive control (MPC) that explicitly models the hydraulic transients within the penstock. It achieves to reduce the mechanical loads on the penstock wall, and, consequently, fatigue effectively. Thanks to a suitable linearization of the plant model, the optimization problem underlying the MPC scheme is convex and can be solved with off-the-shelf optimization libraries. The performance of the proposed controller is tested with numerical simulations on a 230MW medium-head HPP with Francis turbine providing primary frequency control. Simulation results show substantially reduced penstock fatigue, existing approaches outperformed, and problem resolution times compatible with real-time control requirements.
함께 살펴볼 논문
공통 태그를 근거로 연결했습니다. 실제 인용 관계나 논문의 우수성을 뜻하지 않습니다.
Differentiable Nonlinear Model Predictive Control
Evaluating the Impact of Model Accuracy for Optimizing Battery Energy Storage Systems
Re4MPC: Reactive Nonlinear MPC for Multi-model Motion Planning via Deep Reinforcement Learning
Deep Operator Neural Network Model Predictive Control
Knot So Simple: A Minimalistic Environment for Spatial Reasoning
Efficient Configuration-Constrained Tube MPC via Variables Restriction and Template Selection
토론
이 논문과 연결된 포럼 글이 아직 없습니다.