A Multiperiod Workforce Scheduling and Routing Problem with Dependent Tasks
원문 초록
In this paper, we study a new Workforce Scheduling and Routing Problem, denoted Multiperiod Workforce Scheduling and Routing Problem with Dependent Tasks. In this problem, customers request services from a company. Each service is composed of dependent tasks, which are executed by teams of varying skills along one or more days. Tasks belonging to a service may be executed by different teams, and customers may be visited more than once a day, as long as precedences are not violated. The objective is to schedule and route teams so that the makespan is minimized, i.e., all services are completed in the minimum number of days. In order to solve this problem, we propose a Mixed-Integer Programming model, a constructive algorithm and heuristic algorithms based on the Ant Colony Optimization (ACO) metaheuristic. The presence of precedence constraints makes it difficult to develop efficient local search algorithms. This motivates the choice of the ACO metaheuristic, which is effective in guiding the construction process towards good solutions. Computational results show that the model is capable of consistently solving problems with up to about 20 customers and 60 tasks. In most cases, the best performing ACO algorithm was able to match the best solution provided by the model in a fraction of its computational time.
함께 살펴볼 논문
공통 태그를 근거로 연결했습니다. 실제 인용 관계나 논문의 우수성을 뜻하지 않습니다.
Optimal Sensor Scheduling and Selection for Continuous-Discrete Kalman Filtering with Auxiliary Dynamics
SystolicAttention: Fusing FlashAttention within a Single Systolic Array
ANN-Based Grid Impedance Estimation for Adaptive Gain Scheduling in VSG Under Dynamic Grid Conditions
Confucius3-Math: A Lightweight High-Performance Reasoning LLM for Chinese K-12 Mathematics Learning
ConsumerBench: Benchmarking Generative AI Applications on End-User Devices
RapFlow-TTS: Rapid and High-Fidelity Text-to-Speech with Improved Consistency Flow Matching
토론
이 논문과 연결된 포럼 글이 아직 없습니다.