arXiv:1711.04556 공식 코드 · Papers with Code

Solving the Resource Constrained Project Scheduling Problem Using the Parallel Tabu Search Designed for the CUDA Platform

Libor Bukata, Premysl Sucha, Zdenek Hanzalek

제출 2017-11-13

원문 초록

In the paper, a parallel Tabu Search algorithm for the Resource Constrained Project Scheduling Problem is proposed. To deal with this NP-hard combinatorial problem many optimizations have been performed. For example, a resource evaluation algorithm is selected by a heuristic and an effective Tabu List was designed. In addition to that, a capacity-indexed resource evaluation algorithm was proposed and the GPU (Graphics Processing Unit) version uses a homogeneous model to reduce the required communication bandwidth. According to the experiments, the GPU version outperforms the optimized parallel CPU version with respect to the computational time and the quality of solutions. In comparison with other existing heuristics, the proposed solution often gives better quality solutions.

함께 살펴볼 논문

공통 태그를 근거로 연결했습니다. 실제 인용 관계나 논문의 우수성을 뜻하지 않습니다.

토론

이 논문과 연결된 포럼 글이 아직 없습니다.